A wall cladding anchorage has a rod with ends loosely enveloped by fabric
sleeves. The wall is drilled to receive one end and the cladding is
drilled, or otherwise formed with a cavity, to receive the other end.
Either the wall or the cladding may have the anchorage fixed first, by
grout being injected to expand the sleeve and seep through it to bond to
the drilling or cavity wall. Then the cladding is offered up and the other
sleeve likewise expanded, the grout being injected via a duct leading
between the cladding and the wall. Instead of a single part rod, there may
be two elements, such as a tube and a rod that screws into it, each with a
sleeve so that the cladding or wall need not have significantly
projections until shortly before the cladding is fixed. It is also
possible to have a single sleeve over the whole rod and inject grout into
its central zone, between the wall and cladding.
Ένα αγκυροβόλιο επένδυσης τοίχων έχει μια ράβδο με τις άκρες που τυλίγονται αόριστα από τα μανίκια υφάσματος. Ο τοίχος τρυπιέται με τρυπάνι για να λάβει ένα τέλος και η επένδυση τρυπιέται, ή ειδάλλως διαμορφώνεται με μια κοιλότητα, για να λάβει το άλλο τέλος. Είτε ο τοίχος είτε η επένδυση μπορεί να καθορίσει το αγκυροβόλιο πρώτα, από το ρευστοκονίαμα που εγχέεται για να επεκτείνει το μανίκι και να διαρρεύσει μέσω του για να συνδέσει με τον τοίχο διατρήσεων είτε κοιλοτήτων. Κατόπιν η επένδυση προσφέρεται επάνω και το άλλο μανίκι επιπλέον που επεκτείνεται, το ρευστοκονίαμα που εγχέονται μέσω ενός αγωγού που οδηγεί μεταξύ της επένδυσης και ο τοίχος. Αντί μιας ενιαίας ράβδου μερών, μπορούν να υπάρξουν δύο στοιχεία, όπως ένας σωλήνας και μια ράβδος που βιδώνει σε το, κάθε ένα με ένα μανίκι έτσι ώστε η επένδυση ή ο τοίχος δεν χρειάζεται να έχει σημαντικά τις προβολές μέχρι λίγο πριν την επένδυση καθορίζεται. Είναι επίσης δυνατό να υπάρξει ένα ενιαίο μανίκι πέρα από ολόκληρη τη ράβδο και να εγχεθεί το ρευστοκονίαμα στην κεντρική ζώνη του, μεταξύ του τοίχου και της επένδυσης.