A method for fabricating sections of a floating offshore spar type
structure and mating the sections offshore. A buoyant hard tank is
fabricated vertically. The hard tank is then transported in a vertical
orientation to a site where it is mated to a truss section of the spar
structure offshore while the hard tank and truss section are both in the
vertical orientation. The mated tank and truss sections are then towed in
the vertical orientation to the operational site. The hard tank is
fabricated with a larger diameter and correspondingly shallower draft than
a more traditionally proportioned hard tank.