A method and system is provided to determine or estimate components that
may have to be maintained before a molding system that has those
components is caused to be stopped by problems with those components.
Cycle times that each correspond to the time of the cycle of each
operation of the molding system and operation times of the steps performed
by the components, which operation times affect the cycle times, are
measured and stored. Based on the sum of the operation times that exceed a
predetermined time or the sum of the number of operation times that exceed
the predetermined time, any step that may cause a problem among the steps
of the components, which affect the cycle time, is determined.
Eine Methode und ein System wird zur Verfügung gestellt, um Bestandteile festzustellen oder zu schätzen, die beibehalten werden müssen können, bevor ein Formteilsystem, das jene Bestandteile hat, veranlassen wird, durch Probleme mit jenen Bestandteilen gestoppt zu werden. Zykluszeiten, die jede der Zeit des Zyklus jedes Betriebes des Formteilsystems entsprechen und Betrieb Zeiten der Schritte durch die Bestandteile durchführte, denen Betrieb Zeiten die Zykluszeiten beeinflussen, werden gemessen und gespeichert. Gegründet worden auf der Summe der Betrieb Zeiten, die eine vorbestimmte Zeit oder die Summe der Zahl Betrieb Zeiten übersteigen, die die vorbestimmte Zeit übersteigen, wird jeder möglicher Schritt, der ein Problem unter den Schritten der Bestandteile verursachen kann, die die Zykluszeit beeinflussen, festgestellt.