In a power plant including a plurality of parallel-operated generating
elements supplying electricity and steam, boilers and turbines are
controlled in an optimum condition depending on the successive changes of
the demand for steam and electricity by: estimating parameters of
characteristics and state of the generating elements, which cannot be
directly measured, among parameters of the generating elements needed for
calculation of the optimum load distribution for each of the generating
elements, based on a physical model of each of the generating elements and
an input process state quantity; and controlling each of the generating
elements by determining an optimum load distribution for the each of the
generating elements while using the estimated parameters of the each of
the generating elements, to minimize a total cost of the power plant
depending on the successive changes of the demand for steam and
electricity.
In una centrale elettrica compreso una pluralità di elementi di generazione parallelo-funzionati che forniscono l'elettricità ed il vapore, le caldaie e le turbine sono controllate in un'condizione ottimale secondo i cambiamenti successivi della richiesta di vapore e di elettricità vicino: valutando i parametri delle caratteristiche e dichiari degli elementi di generazione, che non possono direttamente essere misurati, fra i parametri degli elementi di generazione stati necessari per il calcolo della distribuzione di carico ottimale per ciascuno degli elementi di generazione, basato su un modello fisico di ciascuno degli elementi di generazione e un processo di input dichiara la quantità; e controllando ciascuno degli elementi di generazione determinando una distribuzione di carico ottimale per il ciascuno degli elementi di generazione mentre usando i parametri valutati del ciascuno degli elementi di generazione, per minimizzare un costo complessivo della centrale elettrica secondo i cambiamenti successivi della richiesta di vapore e di elettricità.