An apparatus and method permit a first, fully loaded base station (13)
controlled by a first operator to utilize the unused resources of a second
base station (15) controlled by a second operator in a time division
duplex cellular communications system. The first base station (13)
monitors broadcast channel of the second base station (15) and identifies
time slots within the time frame structure and at an assigned carrier
frequency which are unused by the second base station (15). It then
calculates a new time frame structure and sets up a communications link
with a subscriber (17) on the assigned carrier frequency during those time
slots that avoid contention with the operations of the second base station
(15). The invention, advantageously, does not require synchronization of
the different operator's base stations (13, 15).
Un matériel et une méthode permettent un premier, la station de base entièrement chargée (13) commandée par un premier opérateur pour utiliser les ressources inutilisées d'une deuxième station de base (15) commandée par un deuxième opérateur dans un système de communications cellulaire de duplex de division de temps. Les premiers moniteurs de la station de base (13) annoncent le canal de la deuxième station de base (15) et identifient les fentes de temps dans la structure de la tranche de temps et à une fréquence porteuse assignée qui sont inutilisées par la deuxième station de base (15). Elle alors calcule une nouvelle structure de la tranche de temps et a installé une liaison avec un abonné (17) sur la fréquence porteuse assignée pendant ces fentes de temps qui évitent la controverse avec les opérations de la deuxième station de base (15). L'invention, avantageusement, n'exige pas la synchronisation des stations de la base de l'opérateur différent (13, 15).