An underground shell-pile continuous wall job practice, which utilizes a
special drill for constructing a continuous wall underground, is initiated
by sinking two coupled special drills connected together by male and
female connectors fixed on the main trunks of them respectively. Then, the
first special drill is withdrawn while simultaneously pouring concrete
into it until the first shell pile is finished. The process of sinking
special drills and withdrawing and pouring concrete to build shell piles
is repeated until the whole continuous wall is finished. In this way,
building an underground continuous wall is rapid, economic and effective.
The special drill has a simple structure which provides for simultaneous
insertion and draining of displaced soil, thereby reducing the sinking
drag force. Thus, earthmoving normally required to build underground walls
is reduced greatly.
Une coquille-pile souterraine la pratique en matière que continue du travail de mur, qui utilise un foret spécial pour construire un souterrain continu de mur, est lancée par deux de descente a couplé les exercices spéciaux reliés ensemble par les connecteurs masculins et femelles fixés sur les troncs principaux d'eux respectivement. Puis, le premier foret spécial est retiré tandis que le béton se renversant simultanément dans lui jusque à la première pile de coquille est fini. Le processus de descendre le béton spécial d'exercices et de se retirer et verser pour construire des piles de coquille est répété jusqu'à ce que le mur continu de totalité soit fini. De cette façon, la construction d'un mur continu souterrain est rapide, économique et efficace. Le foret spécial a une structure simple qui prévoit l'insertion et vidanger simultanés du sol déplacé, réduisant de ce fait la force de résistance à l'avancement de descente. Ainsi, de terrassement normalement exigé de construction aux murs sous terre est réduit considérablement.