In a well production management and storage system having at least one
collecting tank and the well pump and a control panel with a timing
trigger for activating the well pump and deactivating the well pump for a
first predetermined run cycle and a first predetermined rest cycle, the
improvement is a controller for adjusting at least one of the first
predetermined run cycle and the predetermined rest cycle. This controller
detects either changes in rate of rise in liquid in the collecting tank
and/or water level in the well when the pump is in a run cycle. When these
parameters change, by a predetermined increment, the pump run cycle and/or
rest cycle is automatically adjusted.
В хорошей системе и хранения управления производством имея по крайней мере один собирая бак и хороший насос и пульт управления с пуском времени для активировать хороший насос и выключать хороший насос для первого предопределил цикл бега и первое предопределило цикл остальных, улучшением будет регулятор для регулировать по крайней мере одно из первого предопределило цикл бега и предопределенный цикл остальных. Этот регулятор обнаруживает или изменения в тарифе подъема в жидкость в собирая баке and/or уровень воды в добре когда насос находится в цикле бега. Когда эти параметры изменяют, предопределенным инкрементом, цикл бега насоса and/or цикл остальных автоматически регулирует.