Continuous method of realization of works underground, tunnels and excavations in general with works of consolidation, permeabilization and drainage obtained through guided perforations

   
   

Continuous method of realization of underground tunnels, including the steps of making a plurality of guided perforations of small cross-section around a periphery of an underground tunnel to be realized and extending at least a majority of length of the underground tunnel to be realized, by perforation equipment with a movable perforation head, filling each guided perforation through at least one of reinforcements and aggregating materials to consolidate the tunnel with a resistant arrangement according to precise static conditions, and excavating the tunnel within the filled perforations.

 
Web www.patentalert.com

< Piering device with adjustable helical plate

< Electrically operated household appliance

> Space frame support structure employing weld-free, single-cast structural connectors for highway signs

> Pipelayer

~ 00180