A system for manufacturing scheduling for a fabrication system. The fabrication contains a plurality of tool groups, and each of which has at least one tool. The system contains an input/output device, a processor, and a storage device. The processor calculates the tool group count of each tool, and assigns a preference index to each tool accordingly, then derives a preference-based manufacturing schedule.

 
Web www.patentalert.com

< Method and system for communicating a clock signal over an optical link

< Method and apparatus for polarization measurements

> Method of determining the gas quality

> System and method for improving performance of a data backup operation

~ 00206