A method of finding a vertical velocity of a vehicle by first forming two cost
functions from three pulse return times. An independently determined approximate
vertical velocity and a Fletcher-Powell estimation technique are used on the first
cost function, to select a minimum velocity of the first cost function. The selected
minimum velocity, two calculated velocities from the selected minimum velocity,
and a Fletcher-Powell estimation technique are used on the second cost function,
to select a minimum velocity of the second cost function. The selected minimum
velocity of the second cost function is taken as the vertical velocity of the vehicle.