A method for repairing in-ground tunnel structure involves applying a first curable
resin over a cementitious liner which lines the interior wall surfaces of the tunnel,
drilling drainage holes in the cementitious liner, and filling the drainage holes
with a second curable resin. The resins are allowed to cure and harden. The cured
resins seal the wall surfaces and drainage holes to provide a composite tunnel
structure having high mechanical strength and resistance to fluid leaks.