According to this method the units and tens numerals are placed onto respective
indicator runners (1, 2). Two drivelines are formed, one being a daily driveline
between the clock movement and the indicator runners, for moving the units indicator
runner (1) selectively step by step by one step every 24 hours, and for
moving the tens indicator runner (2) by one step for every ten steps of
the units indicator runner (1), in order to move on from one multiple of
ten to the next, and for moving the tens indicator alone by one step to move on
from "31" to "01" on a 31-day cycle, and an annual driveline between the clock
movement and the tens indicator runner, which driveline is programmed to move the
tens indicator runner (2) by one step at the same time as the units indicator
runner (1) is moved by the daily driveline, to move on from "30" to "01"
at the end of the months which comprise less than 31 days.