A method and system for simulating, modeling and scheduling equipment preparation
procedures in the biopharmaceutical production process is described herein. The
use of process vessels in batch process manufacturing is optimized through the
use of peak load scheduling frames. The system and method includes the steps of
identifying soiled process components and their associated equipment preparation
procedures. After the soiled process components are identified, a master list of
soiled process components and their associated equipment preparation procedures
is generated. After the soiled process components and the equipment preparation
procedures are identified, the equipment preparation procedures are scheduled out
based on preparation equipment protocols to generate a equipment preparation load
summary table. Next, the size and capacity of the preparation equipment is determined
based on the information in the load summary table. After the size and capacity
of the preparation equipment is determined, an equipment preparation time line
is generated.