A method for synchronizing planning information in a high availability planning
and scheduling architecture includes processing requests from one or more external
systems (40) using an advanced planning and scheduling (APS) engine (22)
included in a first primary high availability (HA) system (20a).
The processing of requests includes modifying planning information stored in memory
of the first primary HA system (20a) according to the requests. The
method also includes storing change information reflecting the modifications to
the planning information in a database (64) and extracting the change information
from the database (64) at an extraction time. Furthermore, the method includes
updating the planning information using the extracted change information and storing
the updated planning information in memory of a second primary HA system (20a).
In addition, the method includes identifying requests that were processed by the
first primary HA system (20a) after the extraction time and updating
the planning information stored in memory of the second primary HA system (20a)
to account for these requests. The method also includes replacing the first primary
HA system (20a) with the second primary HA system (20a).