To evaluate the adequacy of a profile model, one or more types of process
control to be used in controlling a fabrication process are selected.
Profile model parameters and acceptable ranges for the profile model
parameters are selected. A first and second metrology tools are selected.
Statistical metric criteria that define an acceptable amount of variation
in measurements obtained using the first and second tools are set. A
profile model is selected. A measurement of the profile model parameters
is obtained using the first tool and the selected profile model. A
measurement of the one or more profile model parameters is obtained using
the second tool. Statistical metric criteria are calculated based on the
measurements of the one or more profile model parameters obtained using
the first and second tools. The calculated and set statistical metric
criteria are compared to evaluate the adequacy of the selected profile
model.