A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.

 
Web www.patentalert.com

< Neural network for computer-aided knowledge management

< Model predictive control (MPC) system using DOE based model

> Method and apparatus for determining one or more statistical estimators of customer behavior

> Artificial associative neuron synapse

~ 00282