A cryogenic fluid offloading system, having a tanker vessel (2) moored in
line with an offshore mooring construction (4, 8) and connected to a
processing unit, such as regasification plant (13). The degasification
plant (13) has no large storage facilities, the tanker (2) being unloaded
in dependence on onshore demand for gas.