A compressed air system, wherein a decision to de-energize a compressor
motor is made with consideration of the likely need for the operation of
the compressor at a future point in time. A rate of pressure decay in an
air reservoir may be extrapolated over a predetermined time period to
predict the need for operation of the compressor within the time period.
If operation of the compressor is predicted to be needed within the time
period, the compressor is allowed to continue to run in an unloaded mode
beyond a normal cool down period.