At a first time, an authorized directive is received by the utility
provider to perform an operative action for shedding load of a power
system by a minimum system load value on or before a second time. The
utility provider may operate the SCADA/DCS system to assist in selecting
a set of circuits wherein the total circuit load value of the selection
is greater than or equal to the minimum system load value. In response to
circuit selection, the SCADA/DCS system selects the corresponding set of
circuit breakers and consults the circuit-subscriber notification
database to select a set of subscribers corresponding to the selected set
of circuits. A system, product, and/or device adapted for communicating
data in response to circuit selection may then be accessed by the
SCADA/DCS system to communicate to the selected set of subscribers an
intention of performing the operative action on or before the second
time. The utility provider may then program and/or operate the SCADA/DCS
system to perform the operative action upon the selected set of circuit
breakers on or before said second time.