A method for installing a subsea completion system comprises installing a
conductor housing on the sea floor, landing a wellhead in the conductor
housing, securing a BOP to the wellhead, landing a casing hanger in the
wellhead through the BOP, connecting a tubing hanger to a THRT, landing
the tubing hanger in the wellhead or the casing hanger through the BOP,
installing a wireline plug in the tubing hanger production bore through
the THRT, retrieving the THRT, retrieving the BOP, securing an ROSL to
the christmas tree, landing the christmas tree on the wellhead, and
retrieving the wireline plug from the tubing hanger production bore using
the ROSL.