A plant-operation-schedule optimization system includes a data inputting
device transmitting a future operation planned value of at least one
plant to be controlled; an operation-data inputting device transmitting
operation data concerning the plant; and an operation-schedule
calculating unit receiving the operation planned value and the operation
data concerning the plant from the data inputting device and the
operation data inputting device, respectively, to calculate an optimized
operation schedule of the plant. The operation-schedule calculating unit
includes an optimization calculator calculating the optimized operation
schedule; and a database storing the kind of an operation mode, an
operation pattern, and an operation cost according to the operation mode
of the plant. The data stored in the database is referred to in the
calculation of the optimized operation schedule in the optimization
calculator.