A method for controlling a production process for the manufacture of
customized production objects. A sequence of production objects runs
through at least one partial process of a production process. The method
ensures that, in series production, the processing of an order in the
partial process is begun at the latest after a maximum waiting time. The
sequence of electronically available orders is handled separately from
the sequence of production objects and a copy of the order sequence is
generated. If the first order of the copy does not match the first
production object, the order is stored in an electronic buffer memory and
a matching order for the first production object is determined. The order
with the greatest waiting time is removed from this buffer memory
whenever the previous waiting time exceeds a prescribed waiting time
limit. A production object matching this order is brought forward and
processed according to the order.