According to a first aspect of the present invention, a method is provided
for manufacturing an item. The method comprises the steps of creating a
build schedule; creating a first portion of the item for manufacture;
causing the first portion of the item to pass in close proximity to a
first individual; which said individual assembles at least one of the
several components on the first portion; notifying a second individual of
the existence and location of the first portion of the item proximate to
the first individual; causing the first portion of the item to pass in
close proximity to the second individual whereby said second individual
assembles at least one of the several components onto the first portion
of the item. The method further includes applying dataforms or other such
markings on individual components to uniquely identify them and, through
such markings, tracking the application of those components to the item
being manufactured at each manufacture step. Moreover, the information
associated with the components as they are tracked through the
manufacture process is used to maintain and enhance the efficient
operation of the assembly line. These and other aspects, features, and
advantages of the present invention will become apparent from a reading
of the following detailed description of the preferred embodiment of the
invention and by reference to the following drawings.