A method for estimating power dissipated by processor core processing a
workload includes analyzing a reference test case to generate a reference
workload characteristic, analyzing an actual workload to generate an
actual workload characteristic, performing a power analysis for the
reference test case to establish a reference power dissipation value and
estimating an actual workload power dissipation value responsive to the
actual and reference workload characteristics and the reference power
dissipation value.