A method of site preparation in environmentally sensitive areas. A first
step involves determining boundaries of a site. A second step involves
removing obstacles, if any, from within the boundaries of the site. A
third step involves laying a layer of interlocking wood fibre on the
site. A fourth step involves packing down the layer to form a cohesive
ground cover mat. The steps of laying a layer of interlocking wood fibre
on the site and packing down the layer is repeated to increase a
thickness of the cohesive ground cover mat, until a hard packed base of
at least six inches in depth has been formed.