A system and method that prioritizes product lots for fabrication and
dispatching to manufacturing equipment establishes priorities for
dispatching product lots based on a criticality factor and establishes a
priority for dispatching product lots to manufacturing equipment based on
processing capability and the efficiency of manufacturing equipment. A
computer integrated manufacturing system executes a program process that
functions as a lot dispatcher and a priority factor calculator. The lot
dispatcher is in communication with an order entry system to receive
requests for fabrication and with a process information system to receive
procedures defining which manufacturing equipment is required. A
manufacturing information system provides the lot dispatcher with a
criticality factor and a queue level for each piece of manufacturing
equipment. Then the current group of pieces of manufacturing equipment is
followed with a balanced loading.