An overfilled arch bridge system includes a composite arch which has a
precast layer and a cast-in-place layer. The system further includes
means for reducing bending moments within the overfilled arch. The means
include customizing the arch end geometry and prestressing the arch prior
to or during loading. The system can be used in connection with the
overfilled arch system disclosed in co-pending patent application titled
"Top Arch Overfilled System" filed by the same inventor on Mar. 22, 2002.