Method in which the following operations are carried out: a) digging an
exploration hole (8) in order to open up a main pipeline (2) which has an
upper edge (10) which extends at an upper level (12) which is
substantially constant relative to the ground (6), b) using a branch
connection (14) which has a support surface (16) and a shaft (18) to
which the branch pipe is connected, c) positioning the support surface
(16) of the branch connection (14) against the main pipeline (2) so that
the shaft (18) is below the upper level (12) of the main pipeline (2), d)
fixing the branch connection (14) to the main pipeline (2), e) placing
the branch pipe and the main pipeline (2) in communication, f) refilling
the exploration hole (8), whilst keeping the branch pipe below the upper
level (12) of the main pipeline (2).