A method of enhancing oil production from an oil bearing formation
includes the steps of providing a first borehole in a first region of the
formation and a second borehole in a second region of the formation. A
first electrode is positioned in the first borehole in the first region,
and a second electrode is positioned in proximity to the second borehole
in the second region. A voltage difference is established between the
first and second electrodes to create an electric field across the
plugging materials. The electric field is applied to destabilize the
plugging materials and improve oil flow through the formation.