Methods, systems, and computer program products for managing movement of
work-in-process materials between processing units in an automated
manufacturing environment are provided. A system includes a host system
in communication with a work-in-process (WIP) material lot. The system
also includes an application executing on the host. The application
implements a method that includes tracking a position of the WIP material
lot, receiving a list of the processing units designated to be
inoperative during a down time, and receiving a start time and a duration
of the down time. The method also includes determining a maximum dwell
time for each of the designated processing units and scheduling movement
of the WIP material lot during an interim between a current time and the
start time of the down time based on current position of the
work-in-process material lot, the current time, the start time and
duration of the down time, and the maximum dwell time.