A combined cycle power plant (20) including a main air-cooled condenser
(22) condensing steam at a first pressure and an auxiliary air-cooled
condenser (24) condensing steam at a second pressure higher than the
first pressure. Designing an air-cooled combined cycle power plant for
startup on a hot day can significantly increase the size and cost of the
required air-cooled condenser. Adding an auxiliary air-cooled condenser
having appropriate thermal characteristics relative to a main air cooled
compressor to the steam bypass circuit of an air-cooled combined cycle
power plant enables the plant to meet plant startup requirements during
periods of peak thermal load in a more cost effective manner than would
be achievable with the main air cooled condenser alone.