In the various methods of the present invention, reliance is placed on a
first and second barrier 26 and 30 respectively positioned in a well 10
to provide well control during well suspension, completion and/or
workover operations. Each of the barriers is below the depth of the
lowermost end of a completion string when that string is installed in the
well 10. By not placing either barrier higher up in the well-bore, both
of the barriers can remain in place during suspension and completion and
workover operations, thus obviating the need to use a BOP stack to
supplement well control. This results in a considerable saving in drill
rig time and thus significantly reduces the cost of constructing a well.