Of the many methods and compositions provided herein, one method includes
placing a cement composition in a subterranean formation, wherein the
cement composition includes cement, rock-forming mineral materials, and
water; and permitting the cement composition to set therein. Another
method provided herein includes introducing a settable drilling fluid
into a subterranean formation, wherein the settable drilling fluid
includes cement, rock-forming mineral materials, water, and a set
retarder; and permitting the settable drilling fluid to set in therein. A
composition provided herein includes cement, rock-forming mineral
materials and water. Another composition provided herein includes cement,
rock-forming mineral materials, water, and a set retarder.