An installation vessel has upper and lower decks (40, 50) that are
vertically spaced about 3 meters apart, with most of the lower deck
covered by the upper one, but with a rear portion (60) of the lower deck
being uncovered. The upper deck is used primarily for storage, while the
lower deck is the one used for installation of anchor chains, wires,
ropes, etc. that pass from a winch (81) to a stern roller (84) at the
rear of the lower deck, so dangerous conditions of chains, wires, ropes,
etc. moving along a deck during installation are confined to the lower
deck. A main crane (72) that lies on one side of the vessel, lies forward
of the rear end of the upper deck at a location wherein the crane can
reach all portions of the uncovered lower deck portion and most of the
upper deck.