A well jet device operating method comprises running a jet pump into a well, releasing a packer above a productive formation, pumping hydraulic fracturing fluid though a blocking insert in the pump channel, extracting the blocking insert, running flexible pipe into the well through a sealing unit and arranging the lower end thereof at lower formation perforation interval level. The formation is drained, fluid for washing a bottomhole is supplied by the flexible pipe, maintaining the ratio between pipe pressure value and a casing annulus working medium pressure within a range greater than or equal to 0.98. When at least two volumes of hydraulic fracturing fluid is extracted, the pipe fluid supply is stopped. At least 5 minutes after, off the working medium supply to the pump nozzle is shut off, in examining the formation for evaluating the productivity thereof and in bringing the well into operation.

 
Web www.patentalert.com

< Pump

> Control system for an air operated diaphragm pump

> Variable discharge fuel pump

~ 00511