A scheduling system and method for moving plural objects through a
multipath system described as a freight railway scheduling system. The
scheduling system utilizes a cost reactive resource scheduler to minimize
resource exception while at the same time minimizing the global costs
associated with the solution. The achievable movement plan can be used to
assist in the control of, or to automatically control, the movement of
trains through the system.