A scheduling system and method for moving plural objects through a multipath system described as a freight railway scheduling system. The scheduling system utilizes a cost reactive resource scheduler to minimize resource exception while at the same time minimizing the global costs associated with the solution. The achievable movement plan can be used to assist in the control of, or to automatically control, the movement of trains through the system.

 
Web www.patentalert.com

< Non-disruptive embedding of specialized elements

> Multi-view cognitive swarm for object recognition and 3D tracking

> Image verification method, medium, and apparatus using a kernel based discriminant analysis with a local binary pattern (LBP)

~ 00531