A method for supporting top tension drilling and production risers on a
floating vessel using a tensioner assembly above the water line of the
vessel. The method can include attaching at least one hydraulic cylinder
on a first end to a first position on a floating vessel and on a second
end to a tension frame below the first position. The next step of the
method can be forming a fluid connection between the at least one
hydraulic cylinder and at least one primary accumulator.