Embodiments of the present invention address deficiencies of the art in
respect to construction waste removal and provide a method, system and
apparatus for construction waste removal. In one embodiment of the
invention, a construction waste removal system can be provided. The
system can include an assembled waste chute, the assembled waste chute
comprising a set of waste chute sections that are joined together in an
end-to-end matter and a collapsible waste container configured to receive
waste from a downstream end of the assembled waste chute. The system
further can include a waste transport vehicle including a main frame
disposed along the longitudinal axis of the waste transport vehicle, a
grasping mechanism configurable for removing waste from the collapsible
waste container and disposed adjacent to an operator cab, and a
waste-receiving vehicle bed coupled to the main frame. The system yet
further can include a pair of extension flaps rotatably connected to a
pair of sidewalls and configured to retain the construction waste in the
waste-receiving vehicle bed while the construction waste is being
compacted.