Methods, computer program products and systems are disclosed for
generating a planned time duration for a manufacturing process operation
defined for planning purposes that includes an aggregation of multiple
defined execution operations. Electronic information is received that
specifies a production demand that requires use of the manufacturing
process for fulfillment. A linear approximation is electronically
generated of an overall time duration measure for the defined
manufacturing process planning operation. The overall time duration
measure is a sum of time components comprising at least a calculated
measure for a variable time component for the longest of the multiple
execution operations for the received production demand, and a fixed time
duration measure for one send-ahead quantity for each of the multiple
execution operations that is not the longest. The generated overall time
duration measure is then returned.