According to an embodiment of the invention, a physical server is migrated
to a virtual server, which may then be adopted by a new physical server.
When the physical server is migrated, the physical server contacts a
multi-appliance management application to determine a location on a
storage network for replacement storage. The physical server copies its
data volumes to the replacement storage. The migration process also
converts the operating system of the physical server into a virtual
server. The virtual server is a software incarnation of the physical
server, and can be run using a generic hardware server. The data of the
physical server stored in the replacement storage is linked to the
virtual server. In this way, a physical server is migrated to a virtual
server.