A parcel of land on which to site the plant is identified. The parcel of
land is located such that about 3,500,000 to about 7,500,000 scrap tires
per year are available for substantially regular and substantially
continuous delivery to the plant, at a tipping fee of at least about
$40.00 per ton. The plant is located on the parcel of land. One or more
of synthesis gas, electricity, and steam produced by the plant are sold.