A method for recharging an electric storage battery in the charging system of an electric vehicle from an electric utility power grid includes determining the length of time required to recharge the battery, determining the desired time when the recharge is to be completed, transmitting to the electric power utility the length of time required to recharge the battery and the desired time, and recharging the battery from the utility grid during a period when projected load demand is lower than peak demand and ending no later than the desired time.

 
Web www.patentalert.com

< Cooling structure for secondary battery

> Method and apparatus for automated parking assistance

> Method of controlling engine stop-start operation for heavy-duty hybrid-electric and hybrid-hydraulic vehicles

~ 00587