A composition and method is given for a well control fluid that is
injected into a well during completion or remediation and prevents fluid
flow from a formation into the well during operations (such as shut-in,
or placement or adjustment of tools/hardware) when no fluid flow is
desired. The composition includes a viscoelastic surfactant fluid system
(VES) and a decomposable first solid material, preferably in fiber form,
that forms a pack or plug in the well at the location where fluid would
otherwise leak off, and then decomposes without intervention to release a
product that is a breaker for the surfactant or the micelles of the VES.
The composition optionally also contains a pH control agent and a second
solid (that may also be a fluid loss agent) that affect the decomposition
of the first solid.