A system and method for evaluating workload units in a computer system
whereby each workload unit is assigned an impact number representing the
number of days that the expiration date of a computer system would be
changed if the workload unit were to be added or removed from the system
with all other workload units remaining the same. Each workload unit may
be assigned a different number for each system in the environment. The
inventive system and method simplify the task of combining
multidimensional workload measures and incorporate the interaction with
other workload units in the system by assessing the impact on both a
donor and a recipient computer systems' expiration dates. Thus, the
invention provides a more robust way to measure the effect of moving
workload units between systems to result in a better allocation of work
amongst computer systems in a processing environment.