A system and process enable a device to adjust the duration of various
power modes based on usage of the device. The process includes operating
a device at a fully operational power level, counting a first wait time,
modifying a first wait time modifier in response to detection of image
generating device use prior to expiration of the first wait time, and
reducing power consumption from the fully operational level to a low
power level in response to expiration of the first wait time.