A method for modeling construction risk is provided. The method includes providing a statistical model for each of a plurality of location-based tasks of a construction project model. A model parameter is randomly selected for each of the plurality of statistical models to generate a statistically-based duration for each of the location-based tasks. A schedule duration is then calculated using the statistically-based durations of the location-based tasks, and the steps of providing, randomly selecting, and calculating are repeated until a statistical distribution for the construction project model is generated, such as using a Monte Carlo analysis procedure.

 
Web www.patentalert.com

< Method for producing polyisobutenylphenols

< Optical elements made from ceramics comprising one or more oxides of Y, Sc, in and/or lanthanide elements and mapping optics including the optical elements

> System and method for sequestration and separation of mercury in combustion exhaust gas aqueous scrubber systems

> Synthesized hybrid rock composition, method, and article formed by the method

~ 00619