A process for installing piles for supporting a structure upon the earth
including the steps of driving a first pile segment into the earth a
desired distance from the structure, aligning a second pile segment upon
the first pile segment such that a conduit in the second pile segment is
axially aligned with the conduit of the first pile segment, driving the
first and second pile segments into the earth a desired distance from the
structure, affixing a strand into the conduits of the first and second
pile segments so as to form a starter section, and sliding another pile
segment along the strand so as to reside upon the starter section. A
plurality of pile segments are positioned along the strand so as to reside
in stacked relationship upon the starter section. A cap member is
positioned between a portion of the structure at an uppermost pile segment
of the plurality of pile segments. An end of the strand is anchored in the
cap member.
Een proces om stapels te installeren voor het steunen van een structuur op de aarde met inbegrip van de stappen die van het drijven van een eerste stapelsegment in de aarde een gewenste afstand van de structuur, een tweede stapelsegment richten op het eerste stapelsegment dusdanig dat een buis in het tweede stapelsegment axiaal wordt gericht op de buis van het eerste stapelsegment, dat de eerste en tweede stapelsegmenten drijft in de aarde een gewenste afstand van de structuur die, die een bundel hecht in de buizen van de eerste en tweede stapelsegmenten om een aanzetsectie te vormen, en een ander stapelsegment langs de bundel glijdt om op de aanzetsectie te verblijven. Een meerderheid van stapelsegmenten wordt geplaatst langs de bundel om in gestapelde verhouding op de aanzetsectie te verblijven. Een GLBLID wordt geplaatst tussen een gedeelte van de structuur bij een meest bovenste stapelsegment van de meerderheid van stapelsegmenten. Een eind van de bundel wordt verankerd in het GLBLID.