A computer based method of controlling an industrial process, including the
steps of
measuring the values of at least one process variable (y.sub.1, y.sub.2),
and
predicting future deviations of one process variable (y.sub.1) with regard
to the measured value of said at least one process variable (y.sub.1,
y.sub.2), and providing a control signal (u.sub.FB) based on said
predictions, and by means of a first control law. The method comprises the
further steps of
measuring a measurable disturbance (d) in the process,
predicting future deviations of said process variable (y.sub.1) with regard
to said disturbance but without regard to the measured value of said at
least one process variable (y.sub.1, y.sub.2), and providing a control
signal (u.sub.d) based on said predictions by means of a second control
law.
Een gecomputeriseerde methode om een industrieel proces, met inbegrip van de stappen te controleren van het meten van de waarden van minstens één procesvariabele (y.sub.1, y.sub.2), en het voorspellen van toekomstige afwijkingen van één procesvariabele (y.sub.1) met betrekking tot de gemeten waarde van gezegd minstens één procesvariabele (y.sub.1, y.sub.2), en het verstrekken van een controlesignaal (u.sub.FB) dat op bovengenoemde voorspellingen, en door middel van een eerste controlewet wordt gebaseerd. De methode bestaat uit de verdere stappen van het meten van een meetbare storing (d) in het proces, dat toekomstige afwijkingen van bovengenoemde procesvariabele voorspelt (y.sub.1) met betrekking tot bovengenoemde storing maar ongeacht de gemeten waarde van gezegd minstens één procesvariabele (y.sub.1, y.sub.2), en het verstrekken van een controlesignaal (u.sub.d) dat op bovengenoemde voorspellingen door middel van een tweede controlewet wordt gebaseerd.