In a line protection unit for monitoring fault conditions of an electrical power line and actuating breakers to disconnect the line from a power supply bus, the supply bus is in the ring bus arrangement including a first bus and an auxiliary bus so that each power line includes first and second breakers. The three phase current in the line is monitored at both the breakers and summed in the unit to allow calculation of the fault conditions based upon the total current in the line. In the event of a fault condition, both breakers are tripped. In the event of breaker failure so that current continues to flow, this is detected in the unit and all the first breakers tripped to prevent the faulty breaker from allowing current to flow to the faulty line.

В блоке предохранения от линии для контролировать аварийные условия линии электропитания и срабатывать выключатели для того чтобы отключить линию от шины источника питания, шина поставкы находится в расположении шины кольца включая первую шину и вспомогательную шину так, что каждая электролиния включит сперва и вторые выключатели. Течение 3 участков в линии проконтролировано на обоих выключателях и суммировано в блоке для того чтобы позволить вычисление аварийных условий основанных на полном течении в линии. В случае аварийных условий, оба выключателя задействованы. В случае отказа выключателя так, что течение будет продолжаться пропустить, это обнаружено в блоке и всех первых выключателях задействованных для того чтобы предотвратить небезупречный выключатель от позволять течение пропустить к небезупречной линии.

 
Web www.patentalert.com

< Image forming apparatus including components mounted and/or dismounted in selected order

< Quotient algorithm in monitoring disturbance processes

> Liquid crystal optical element and test method for its boundary layer

> Method and system for estimation of rainfall intensity in mountainous area

~ 00095