Method for control of a plant

   
   

A scheme for management of uncertainty in control systems that require adaptation is described. The scheme removes as much uncertainty as possible at design time and manufacturing time by taking advantage of available computer resources in pre-computing a large set of robustness-performance tradeoffs. a plant that is controlled by having model controllers and a data evaluator receive monitored signals. The monitored signals are evaluated to determine when sufficient information is received. One of the model controllers generates a control signal based upon the monitored signals received.

Uno schema per l'amministrazione di incertezza nei sistemi di controllo che richiedono l'adattamento è descritto. Lo schema rimuove tant'incertezza come possibile a tempo di disegno ed a tempo di manufacturing approfittando delle risorse disponibili del calcolatore nella pre-computazione dell'insieme grande delle alternanze di robustezza-prestazioni. una pianta che è controllata avendo di modello regolatori e un esperto di dati riceve i segnali controllati. I segnali controllati sono valutati determinare quando le informazioni sufficienti sono ricevute. Uno dei regolatori di modello genera un segnale di controllo basato sui segnali controllati ricevuti.

 
Web www.patentalert.com

< Method for checking beam generation and beam acceleration means of an ion beam therapy system

< Loop antenna

> Interferometer and its fabrication method

> Intelligent electronic appliance system and method

~ 00115